Estimated time: 10 minutes w/o questions.
The Real Power Is
Knowledge!

* Authorized LTI UPS Factory Representative For All Texas !
POWER
- UPS Seminars Sponsored By: -
This Seminar is technical in nature, complete with one-line diagrams coupled with documented field application information.  Fitting the right type and or technology of UPS system with the application reduces overall cost to Consulting Engineers and their customer while dramatically increasing reliability as needed.  This is an informative and entertaining seminar and I suggest if you have any customers in the need for a UPS system they should be invited as well.
1) Offline, Line interactive, and ON line dual conversion UPS systems.
2) Type of UPS systems complete with 1 lines and real-life application do's and don't for  each type.
Estimated time: 10 minutes w/o questions.
BASIC-101 UPS SYSTEMS
Subject:
Subject:
INDUSTRIAL vs COMMERCIAL UPS SYSTEMS
1) Why and analysis of the difference - Commercial including (industrialized) versus true Industrial UPS systems.  The impact of the difference is system reliability.  
Estimated time: 20 minutes w/o questions.
Subject:
UPS TECHNOLOGY - FERRO vs PWM / ANALOG vs DIGITAL
(On line, dual conversion)
1) Theory and concept of PWM and Ferro-resonant UPS systems.   
2) Impact of each design on reliability, cost, response and efficiency.
Estimated time: 10-15 minutes w/o questions.
Subject:
3-PHASE OUTPUT vs 1-PHASE OUTPUT UPS SYSTEMS
(On line, dual conversion)
1) Hugh difference between reliability and fault clearing capability.  This seminar is complete with 1-lines and supporting information.  
Estimated time: 10 minutes w/o questions.
Subject:
REDUNDANT UPS SYSTEMS & APPLICATIONS
(On line, dual conversion)
1) Advantages and disadvantages of each - Complete with theory, drawings and applications.   
Estimated time: 10 minutes w/o questions.
Subject:
INDUSTRIAL STATION CLASS BATTERIES
(Gel, Sealed, Flooded, Ni-Cad)
1) Which type to use, where and which to not use per application (Gell, VRLA, Flooded and NI-Cads).   
Estimated time: 5-10 minutes w/o questions.
BATTERY TESTING AND MONITORING
Subject:
(Gel, Sealed, Flooded, Ni-Cad)
1) When to use it and what it needs to do to provide reliable battery conditions.    Theory and Concept with drawings.
Press to see fire damage when wrong batteries are used!
  Biography of the Presenter:
Copyright © 2006
* Experience and Quality - Call Us Today!
713-385-5009 / 281-556-0380
Fax: 281-556-0380
DON'T GET CAUGHT WITH YOUR BATTERIES DOWN!
SOLUTIONS LLC
DIEBOLD
         The presenter of our UPS and Battery Technical Seminars is an Electrical Engineer with over 20 years of UPS system application experience.  He was involved with IEEE during the establishment of recommended testing for industrial batteries in industrial applications.  He has been a requested consultant and speaker by NASA, FAA, and major Petroleum / Chemical companies in an effort to increase UPS and DC system reliability and safety.

To request this seminar, contact Diebold Power Solutions using our website 'Email Us' link or email Fred Diebold directly at fdiebold@sbcglobal.net.
Best Regards,

Fred Diebold
Fire Damage Pictures